PM Fan Replacement Program 2025 – Complete Eligibility Criteria & Application Guide

In recent years, the rising cost of electricity in Pakistan has become a pressing concern for families across the country ⚡. Every month, households receive inflated bills that strain their limited budgets. One major reason behind these high costs is the use of old and inefficient appliances, particularly ceiling fans, which are widely used in almost every home.

Traditional ceiling fans consume excessive amounts of energy, and since they are used for several hours daily—especially in the scorching summers—the electricity bills shoot up drastically. With millions of households relying on fans as a basic necessity, the overall energy wastage is enormous.

To tackle this issue, the Government of Pakistan has introduced the PM Fan Replacement Program 2025, spearheaded by Prime Minister Shehbaz Sharif. The program aims to provide households with access to modern, energy-efficient ceiling fans (known as e-fans) at subsidized rates. These fans consume significantly less power, reduce household expenses, and contribute to the country’s larger mission of energy conservation 🌍.

But the question many people are asking is: Who can apply for this scheme, and what are the requirements? Let’s break it down step by step.

PM Fan Replacement Program 2025

What is the PM Fan Replacement Program 2025?

The PM Fan Replacement Program 2025 is a government-backed initiative that allows citizens to replace their outdated ceiling fans with new energy-efficient models. These modern e-fans are designed to consume up to 40% less electricity while providing the same—or even better—airflow.

This simple change can make a huge difference, especially considering that Pakistan has over 90 million ceiling fans installed nationwide. By replacing even a fraction of these with efficient models, the country can save a massive amount of energy.

Core Objectives of the Program:

  • Reduce energy wastage in households.
  • Provide financial relief to families through lower electricity bills.
  • Ease the pressure on the national grid, reducing load shedding.
  • Support Pakistan’s climate and energy goals, by moving toward greener technologies.

This isn’t just a subsidy—it’s part of a broader energy conservation strategy that benefits both the people and the nation.

Why Energy-Efficient Fans?

Many people wonder why the government is focusing on ceiling fans. The answer is simple: fans are the most widely used household electrical appliance in Pakistan.

  • A standard old ceiling fan consumes between 100–120 watts.
  • A modern energy-efficient e-fan consumes 50–60 watts.

Imagine if millions of fans are replaced—the collective savings could reach 1,000 MW annually, which is equivalent to the output of a full-sized power plant.

For an individual family, this means monthly savings of hundreds to thousands of rupees, depending on usage. For the nation, it means reduced dependence on costly imported fuels and a more stable electricity supply.

Eligibility Criteria for PM Fan Replacement Program 2025

The government has set strict eligibility rules to ensure that the scheme is not misused. Only genuine households can benefit from this program. Here are the conditions in detail:

  1. 🏠 Residential Users Only
    • The program is strictly for domestic electricity consumers.
    • Commercial units like shops, offices, or factories are not eligible.
  2. 🔌 Valid Electricity Connection
    • The applicant must have a registered electricity meter in their own name.
    • Connections that are illegal or in dispute will not qualify.
  3. 📄 Clean Payment Record
    • Applicants must have a clear payment history for the past six months.
    • If there are defaults or pending dues, the application will be rejected until cleared.
  4. 👪 One-Time Benefit
    • Each household can apply for a maximum of three (3) fans under this program.
    • This ensures fair distribution and prevents hoarding.
  5. 🌐 Online Registration Only
    • Applications must be submitted via the official eFan Portal (efan.gov.pk).
    • Manual or offline submissions are not accepted.

💡 Note: If your meter is registered under a family member’s name (e.g., father, husband, or wife), you can still apply, as long as the documents match.

Required Documents 📑

To apply without delays, keep these documents ready:

  • CNIC (Computerized National Identity Card) – must be valid and not expired.
  • Latest Electricity Bill – should be in your or a family member’s name.
  • Proof of Residential Address – can be the electricity bill itself or another supporting document.
  • Active Contact Number – to receive SMS updates and verification calls.

Having accurate and updated documents is crucial, as even small mismatches can result in rejection.

Step-by-Step Guide: How to Apply

Applying for the PM Fan Replacement Program 2025 is easy and can be done online from the comfort of your home.

PM Fan Replacement
  1. Go to the official portal 👉 efan.gov.pk.
  2. On the homepage, click “Apply Now”.
  3. Enter your CNIC number and electricity bill reference number.
  4. Fill out the online form with your personal and household details 🖊️.
  5. Upload the required documents (CNIC and bill).
  6. Submit the form and wait for verification.
  7. Once approved, you will receive a confirmation SMS.
  8. Collect your fans from the nearest designated collection center.

⚠️ Important: Each applicant can only register once. Multiple applications under the same CNIC will be blocked.

Why This Program Matters for Pakistan 🌏

Pakistan’s energy challenges are not limited to high bills—they extend to power shortages, rising fuel imports, and environmental damage. The PM Fan Replacement Program directly addresses these problems.

National-Level Impact

  • 1,000 MW annual savings – Enough to power millions of homes.
  • 💰 Lower reliance on imported fuel – Saves valuable foreign reserves.
  • 🔋 Less load shedding – With reduced demand, power cuts can decrease.
  • 🌱 Green Pakistan initiative – Encourages sustainable practices.

Household-Level Impact

  • Lower monthly electricity costs.
  • Relief from financial stress.
  • Long-lasting and durable fans.
  • Better comfort during hot summers.

Simply put, the program offers a win-win situation for both households and the government.

Who can apply for this program?

Residential electricity consumers with valid meters, clean payment records, and proper documents.

Can businesses or shops apply?

No, this program is only for households.

How many fans can each family get?

Each household can apply for up to 3 fans only.

Is online registration mandatory?

Yes, applications must be submitted via efan.gov.pk.

When will I receive my fan after applying?

Once your documents are verified, you will be notified about the nearest collection center.

Is this scheme available across Pakistan?

Yes, the program is nationwide, covering all major electricity distribution companies.

Conclusion

The PM Fan Replacement Program 2025 is a visionary step toward energy conservation and household relief. By replacing outdated, power-hungry fans with subsidized e-fans, families can enjoy lower bills, better comfort, and long-term savings.

For Pakistan, this initiative reduces pressure on the national grid, cuts down costly fuel imports, and supports a sustainable energy future 🌟.

👉 Don’t delay! Check your eligibility today at efan.gov.pk and apply before the deadline to secure your subsidized fans.

Leave a Comment